Return to Main Menu
|
MUSC Rumor Mill separates fact from
fiction
Bazaar
Rumor: Is it true
that anyone can set up a yard sale outside of the library?
Truth: No, this is
not true. There are long-standing policies and procedures for use of
campus property. The Office of Enrollment Management oversees
reservations for classrooms and several special use areas of campus.
For information, contact Sharon Gilliard at 792-5094.
Cafe at
Hollings Cancer Center
Rumor: I heard that
Hollings Cancer Center is supposed to be getting a cafe. Is this true?
Truth: We are not
aware of any plans to place a retail food operation in Hollings Cancer
Center.
Hospital
cafeteria
Rumor: I was told
last year that the cafeteria would be remodeled the first of this year.
I see no signs of any work starting to improve such an eye sore.
Truth: MUHA and
Sodexho, the dietetic services company, are working on plans to
refurbish the serving and seating areas of the cafeteria.
Subway
Rumor: I have heard
many staff and visitors complain that Subway restaurant routinely
closes before the posted closing time. Are the Subway staff supposed to
close early so they can clean up and leave by the posted closing time?
Are they MUSC employees?
Truth: Subway is a
contractor-operated food service operation. Subway is required to
remain open as indicated by the posted hours of operation.
Starbucks
and extended cafeteria hours
Rumor: I heard that
administration was planning to make food/drinks available for staff and
visitors during “off” hours. I heard this would include the cafeteria
and Starbucks for the night shift. Will this happen?
Truth: There is no
plan for Starbucks to remain open for the night shift. The cafeteria
will be open until 3 a.m. in the future. Staff is being recruited at
this time. Operational plans and menus are being finalized.
University
Communications
Rumor: Will the
University Communications office will be relocated to Harborview Office
Tower (HOT).
Truth:
Communications: OCIO Networking and Telecommunications personnel will
relocate to HOT. We are attempting to consolidate as many OCIO
personnel as possible on the second floor of HOT in order to fully
utilize that space. Field engineers will move from Rutledge Avenue into
the 25 Ehrhardt St. building. We are looking into the possibility of
having some telephone services/equipment remain in Ehrhardt.
Reproduced from http://www.musc.edu/rumor/.
Friday, May 4, 2007
Catalyst Online is published weekly,
updated
as needed and improved from time to time by the MUSC Office of Public
Relations
for the faculty, employees and students of the Medical University of
South
Carolina. Catalyst Online editor, Kim Draughn, can be reached at
792-4107
or by email, catalyst@musc.edu. Editorial copy can be submitted to
Catalyst
Online and to The Catalyst in print by fax, 792-6723, or by email to
catalyst@musc.edu. To place an ad in The Catalyst hardcopy, call Island
Publications at 849-1778, ext. 201.
|